OEM/ODM Knitwear Process
From RFQ to Shipment

A milestone-based process from RFQ to shipment, with a pre-production sample approved before bulk starts.

Sample making 3-7 days
Bulk production 15-45 days
Multi-step QC & clean appearance

Which Route Are You Starting From?

This process applies to both cooperation routes; only the starting point differs.

You have a tech pack

Execution to your specification, with approvals against your measurement chart.

OEM knitwear manufacturing →

You have a concept

Factory-supported development from an existing style or a reference you like.

ODM sweater development →

You need the terms first

Minimums, sampling and bulk timing, peak-season planning.

MOQ and lead time →

No Guesswork: What You Provide vs What We Deliver

What we need from you at RFQ, and what you get back.

You Provide (Minimum RFQ)

  • Tech pack or reference images + target fit
  • Size chart / measurement points
  • Quantity by color + size ratio
  • Target yarn/fiber (or we match from reference)
  • Target delivery window + ship-to country
  • Branding & packaging requirements

We Deliver (What You Get Back)

  • Feasibility confirmation + risk notes
  • Line-item quotation + draft timeline
  • Sample + revision plan
  • PP (pre-production) approval package
  • Bulk production milestones + QC checkpoints
  • Packing list guidance + shipment handover documents

10-Step Execution Process

Each step lists what you do and what we do.

1
RFQ Intake
You: Share specs/targets.
We: Confirm feasibility and clarify open points.
2
Quote & Timeline
You: Confirm quantity, colorways, delivery expectation.
We: Send quote + milestone schedule.
3
Yarn & Color Confirmation
You: Choose yarn/color (or reference).
We: Match yarn options and confirm colors (200+ shade cards available).
4
Sample Making
You: Confirm sample brief.
We: Produce sample in 3-7 days (complexity may extend).
5
Sample Review & Revisions
You: Fit/hand-feel/appearance feedback.
We: Revise until approval (revision adds time).
6
PP Sample Approval (Locks the Standard)
You: Approve size, color, trims, workmanship.
We: Seal PP so that "PP = bulk" holds.
7
Bulk Production
You: Confirm PO details.
We: Start bulk with capacity planning (70 machines; ~150k pcs/month).
8
Inline QC
You: Receive updates at checkpoints.
We: Check size, clean appearance, consistency and workmanship.
9
Final QC + Rework + Packing
You: Confirm packing requirements.
We: QC → repair if needed → pack to spec → prepare cartons.
10
Shipment & Documents
You: Choose freight mode / forwarder.
We: Hand over cargo + docs (China receiving address available).

How We Lock "PP = Bulk"

Sample making takes 3-7 days. Once approved, the PP sample locks the standard for:

  • Measurement points + tolerances
  • Yarn/fiber + stitch structure
  • Color confirmation
  • Trims (labels, buttons, zippers, etc.)
  • Packing requirements (bag, carton, labeling)
Send Tech Pack for Sampling

QC Control Points

We focus on stable quality and clean appearance, especially the details that affect sell-through and returns.

  • Measurements & size consistency
  • Appearance (clean finish, neat details)
  • Loose ends / repairs
  • Color/shade consistency (across sizes)
  • Hand-feel & workmanship
  • Trims installed & Packing accuracy
Team: 20 in QC, 8 in ironing, 6 in packing and 6 in design/tech.

Lead Time & MOQ Rules

Reference timelines for planning a seasonal launch.

MOQ: 50 pcs each size per color.
*Higher quantity usually lowers unit cost.
Samples: Production 3-7 days + Courier 5-10 working days.
Bulk Production:
  • <500 pcs: ~15-35 days
  • 500-1000 pcs: ~25-45 days
  • >1000 pcs: by agreement
Why can 50 pcs and 500 pcs take similar time?
Bigger orders are assigned more machines in parallel; small batches have limited machine allocation. Order before September to avoid peak season (Aug-Jan) delays.

Materials & Stitches Support

Yarn, shade card and stitch options to choose from.

  • Yarn & Color: 100+ yarn options & 200+ shade cards. We match based on your info/reference.
  • Core Stitches: Single jersey, ribs, cables, jacquard, intarsia, pointelle, links, full cardigan, moss, double jacquard.
  • Craft Options: Embroidery, hand-made crochet, digital printing, beads, tie-dye, old-washed effects.
No Tech Pack? Provide this minimum brief:
  • 2-3 reference photos + target fit
  • Target yarn feeling (soft/warm/light)
  • Quantity by color + size ratio
  • Logo/branding needs

Practical, Export-Ready Shipping & Packaging

Cartons are packed to your specification before handover.

Air Freight
Fast, higher cost.
Suggested for ≤100 kg.
Sea Freight
Cheaper, longer transit.
Suggested for ≥100 kg.
Rail Freight
Relatively stable, slower.
Suggested for ≥20 kg.

Packaging Options

Inner polybags + cartons can be standard or customized.

  • Standard Carton: 60×45×42 cm
  • Thick Styles: ~20-25 pcs/carton
  • Thin Styles: ~40-45 pcs/carton
  • Custom Branding: Neck label, care label, hangtag, stickers (prepare in advance).

Have Your Own Forwarder?

No problem. We can provide a China receiving address for your forwarder to pick up easily.

Export knitwear cartons stacked and taped on a flatbed trailer before dispatch
Export cartons taped and stacked before dispatch
Stretch-wrapped knitwear cartons loaded in a box truck at the factory
Stretch-wrapped cartons ready for pickup
Knitwear shipment covered with waterproof tarpaulin and secured for road transport
Loads covered with tarpaulin against rain
70
Computer Knitting Machines
50
Sewing & Linking Machines
150k
Pcs/Month Capacity
5+ Yrs
US/UK/GER Market Exp.

Send Your RFQ

Send your tech pack or references and we'll reply with feasibility, a line-item quote, and a draft schedule.


Upload Tech Pack / References
Supported: PDF, JPG/PNG, XLSX
Direct Contact

WhatsApp / WeChat / Phone:
+86 13827229889

Email:
sweaters@dgcainan.com

RFQ Checklist
  • Tech pack / Reference photos
  • Size chart / Target fit
  • Target yarn / material
  • Estimated quantity
  • Delivery timeline